NTPC Floats Balance of System Tender for 325 MW of Solar Project

0 279

(EPT) : NTPC Renewable Energy Limited ( A wholly owned subsidiary of NTPC Ltd.) has invited bids for a balance of system (BoS) package for 325 MW of projects located at Shajapur Solar Park, Madhya Pradesh.

The last date to submit bids is January 31, 2022 & bids will be opened on the same day. The pre-bid meeting will take place on 17 January 2022 . Tender cost is INR 22500/-.

For More details of tender click here:

The scope of work include the design, engineering, manufacturing, supply, packing, forwarding, transportation, unloading, storage, installation, testing, and commissioning of solar projects, excluding solar photovoltaic (PV) modules supply. PV module shall be supplied as owner issued material by NTPC REL.

The successful bidder will design and construct module mounting structures (MMS) and install the modules interconnecting the systems. They must also provide module cleaning systems, including all accessories. They must also provide a supervisory control and data acquisition (SCADA) system for remote monitoring and control with all hardware and software.

To participate in the competitive bidding process, bidders must have supplied and commissioned a BoS package for at least 40 MW of grid-connected solar projects. One project should be of a 10 MW capacity or above. In addition, the project should have been in operation for at least six months before the date of the techno-commercial bid opening.

Alternatively, the bidders must be developers of grid-connected solar projects with a total installed capacity of 40 MW or above. Of this, one solar project with 10 MW or above capacity needs to be in operation for at least six months before the date of techno-commercial bid opening.

Bidders must have executed an industrial project either as developers or as engineering, procurement, and construction (EPC) contractors in the area of power, steel, oil, gas, petrochemical, fertilizer, cement, or coal mining in the last ten years.

Bidders must have executed at least one electrical sub-station of 33 kV or above voltage level, including equipment like circuit breakers and power transformers.

For a single 105 MW project or 220 MW project, the bidders’ minimum average annual turnover should be above INR 64 Crs. in the last three financial years. To bid for the total 325 MW capacity, their minimum annual average turnover should not be less than INR 128 Crs. in the last three financial years. Their net worth should equal or be above their paid-up share capital in the last financial year.

Source: NTPC tender Portal

Leave A Reply

Your email address will not be published.